Site Development

Balmoral Residences

BHM were initially employed by Balmoral Development Ltd to carry out site clearance and bulk earthworks on the project.

Client: Balmoral Development Ltd

The Balmoral Development is a gated community comprising a total of 70 single family lots, located on the south side of Stanford Drive. As part of sub-division works, BHM were initially employed by Balmoral Development Ltd to carry out site clearance and bulk earthworks on the project. Having successfully delivered this element of the works, the client had the confidence to negotiate significant additional works including the installation of a gravity and forced sewer system, water main, road sub base and hot mix asphalt paving. The works took place on a congested site as the lots were built while BHM carried out the subdivision element. BHM liaised closely with other contractors to ensure the works progressed smoothly and safely.

BHM were employed by Balmoral Developments to carry out the following scope of works:
Site clearance
Bulk earthworks
Storm and sewerage drainage
Associated manholes and laterals
Water main
Roadway sub base
Hot Mix Asphalt paving Subdivision including Ground works, Infrastructure and Roadways

Services Provided

Risk management
Value engineering
Construction management
Coordination with other contractors on site
Engineering including drainage and asphalt design

Customer Benefits

Collaborative approach to negotiate additional works
Delivery on time and budget
Single point of contact for client team
Extensive value engineering input
Close working relationship with other contractors on site