Hot Mix Asphalt Supply
Design and manufacture of asphalt.
BHM designs and manufacture of Hot Mix Asphalt (HMA) to all international specifications (ISO 9001 accredited)
BHM’s selection of superior quality constituents following inspection of potential quarries by our Quality Assurance / Quality Control (QA/QC) team, assisting suppliers in producing materials to specified criteria, rigorous sampling & testing at source and on arrival at mixing plants. BHM has three asphalt mixing plants two of which are fully mobile.
Download: ISO DMA 9001 Asphalt Certificate
Certification to ISO 17025 Standards
Implementation of sampling and testing regime of all constituents and of finished product throughout production (ISO 17025 accredited for Civil Engineering Materials Testing).
Download: IAS Certificate Testing Laboratory TL-348
Decades of Manufacturing Experience
BHM understands the Client’s technical requirements and is able to manufacture to the required Standard and Specification demanded. Modification of bitumen to various Performance Grades (PG) using Reactive Polymers, Latex, Wax Modifiers to comply with Client’s specifications for Elastic performance and Stiffness.
BHM employs a technical team with many years’ experience of design and manufacturing bituminous materials on many continents to a variety of Standards and Specifications
Mobile Asphalt Plants
Mobile plants can be shipped to required location and set-up in the most suitable position for the works.
Erection and calibration of the Mobile plant is completed within six days of arrival at the location.
Mobile Materials Testing laboratories allow on-site QA/QC.



Implementation of sampling and testing regime of all constituents and of finished product throughout production (ISO 17025 accredited for Civil Engineering Materials Testing).
BHM understands the Client’s technical requirements and is able to manufacture to the required Standard and Specification demanded.
Modification of bitumen to various Performance Grades (PG) using Reactive Polymers, Latex, Wax Modifiers to comply with Client’s specifications for Elastic performance and Stiffness.
BHM employs a technical team with many years’ experience of design and manufacturing bituminous materials on many continents to a variety of Standards and Specifications
Mobile plants can be shipped to required location and set-up in the most suitable position for the works.
Erection and calibration of the Mobile plant is completed within six days of arrival at the location.
Mobile Materials Testing laboratories allow on-site QA/QC.
Want to learn more?
To speak with an BHM Co. Ltd. associate contact us today!