Ports

Freeport Container Port Phase 1

BHM has executed multiple projects at the Freeport Container Port creating over 60 acres of container stacking areas.

Client: Freeport Container Port

The Phase One Pavement Revitalization Project was for the removal of approximately 32 acres of existing block paving and replacement with PQ concrete &  infrastructure works over a continuous 4 Phase Schedule, in an Operating Port.

The project scope included:
Removal of Existing Block Paving & Base Material
Installation of Electrical Duct Banks
New Water-mains
Profile Planning
Falling Weight Survey of Existing Base
CBM Base Treatment
Drainage and Well Drilling
New Roadway and Container Stacking Area Concrete Paving
Joint Cutting & Sealing
Container Bay and Road Marking

Services Provided

Design & Build Contract
Concrete Mix Design, Production & Installation
Construction Management
Laboratory Testing
Working Under Live Port Conditions & Protocols

Customer Benefits

Collaborative Approach to give Client Best Value
Single Point of Contact for Client Team
Coordination with Existing Infrastructure
In house plant, materials and testing
On site Concrete storage and Batching Plant