BHM has executed multiple projects at the Freeport Container Port creating over 60 acres of container stacking areas.
Client: Freeport Container Port
The Phase One Pavement Revitalization Project was for the removal of approximately 32 acres of existing block paving and replacement with PQ concrete & infrastructure works over a continuous 4 Phase Schedule, in an Operating Port.
The project scope included:
• Removal of Existing Block Paving & Base Material
• Installation of Electrical Duct Banks
• New Water-mains
• Profile Planning
• Falling Weight Survey of Existing Base
• CBM Base Treatment
• Drainage and Well Drilling
• New Roadway and Container Stacking Area Concrete Paving
• Joint Cutting & Sealing
• Container Bay and Road Marking
Services Provided
• Design & Build Contract
• Concrete Mix Design, Production & Installation
• Construction Management
• Laboratory Testing
• Working Under Live Port Conditions & Protocols
Customer Benefits
• Collaborative Approach to give Client Best Value
• Single Point of Contact for Client Team
• Coordination with Existing Infrastructure
• In house plant, materials and testing
• On site Concrete storage and Batching Plant