Client: Island Hotel Company Ltd
Project Description
BHM were appointed by Atlantis Paradise Island, (Island Hotel Company Ltd). for the Installation of a new Chilled Water line from the existing Pump/Chiller Room to improve water coolness for the Dolphin Cay Experience . The project including.
- Working within a live environment, existing infrastructure & Utilities and in close proximity to Hotel Guests.
- Connection to existing Pump and Cooling Room infrastructure, including specialized Fittings and pipe route supports.
- Installation of 880ft of 12” PVC heavily Insulated pipe.
- Traffic management and crossing live hotel access road, paving and white lining.
- Builders work in connection with existing structures.
Services Provided
• Risk management
• Value engineering
• Construction management
• Coordination with Client
Customer Benefits
• Liaison withClient to ensure seamless installation and commissioning
• Sequencing in accordance with Client/Hotel Requirements
• Single point of contact for client team
• Engineering Quality Assurance of installations
• ISO Certification
