BHM were appointed for the design, construction and commissioning of an 30,000 igpd potable seawater reverse osmosis plant, a Glass Fused Water Storage Tank, and backup Generation designed for continuous operation 24 hours per day, 365 days per year, producing potable water to the WHO and WSC Guidelines.
With the requirement for potable quality water, and Distribution in South Andros New Providence Water Corporation Contracted, as Operator, Contracted BHM to commission a new Reverse Osmosis and water storage and distribution facility to serve South Andros.
The project included:
• Bulk Earthworks & Site Preparation
• 30,000 igpd Fully Containerized RO Plant.
• Sea Water Supply and Disposal Wells
• 100,000 ig Glass Fused Storage Tank and pumping facility
• Distribution Pumps
• Infrastructure Works for Primary Electrical Supply (BPL) ,
Transformers and Back up Generator
300,000 igpd Salt Water Reverse Osmosis Water Plant
Client: New Providence Water Development (NPWDCo)
Services Provided
• Design, Build and Commission
• New Service to Customers with Potable Water Quality to WHO Guidelines
• Fully Automated Plant
• 24 hour, 7 day week operation
Customer Benefits
• Climate Reliance Construction.
• Enhanced Customer & Client Experience
• Single Point Of Contact For Client Team
• Containerized Fully Automated RO Plant
