BHM were appointed for the design, construct and commission an expandable 2.0mgd potable seawater reverse osmosis plant, designed for continuous operation 24 hours per day, 365 days per year.
Client: Grand Bahama Utility Co Ltd (GBUC)
With Increased Requirement for Potable Quality Drinking Water and Protection against Climate Resilience, GBUC commissioned BHM to Design & Build a new Brackish Reverse Osmosis and water storage and distribution facility grand Bahama. The New BWRO Plant was Designed
to Protect Against Climatic Changes and Utilizing Sections of the Existing Infrastructure and Brackish Water Fields.
The project included:
• Design Engineering & preparation of Contract Documents for Approval.
• Bulk Earthworks & Site preparation
• Six Number Raised for Climate Resilience, Containerized Brackish 500KUS gpd RO system and Accessory Equipment, & Water Blending System
• One Number CIP Containerized Control Unit.
• Pipe Work Distribution Infrastructure, from Feed water Location to BWRO units, to Disposal Well and Storage Tank, designed for Climate Resilient Measures.
• New Glass Fused 100,000 USg storage Tank.
• Six Number Booster pumps
• Six Number Transformers and 3 Phase Power Distribution.
• Earthing
• Brine Well & Associated Pipework
• 3 number Standby Generators
Services Provided
• Design, Build , Install and Commission
• Maintenance of Service to Customers.
• Fully Automated Plant
• 24 hour, 7 day week operation
Customer Benefits
• Designed for Climate Resilience
• Potable Drinkable Water Quality
• Enhanced Customer & Client Experience
• Single Point Of Contact For Client Team