Reverse Osmosis

Grand Bahama Well Field 1

BHM were appointed for the design, construct and commission an expandable 2.0mgd potable seawater reverse osmosis plant, designed for continuous operation 24 hours per day, 365 days per year.

Client: Grand Bahama Utility Co Ltd (GBUC)

With Increased Requirement for Potable Quality Drinking Water and Protection against Climate Resilience, GBUC commissioned BHM to Design & Build a new Brackish Reverse Osmosis and water storage and distribution facility grand Bahama. The New BWRO Plant was Designed
to Protect Against Climatic Changes and Utilizing Sections of the Existing Infrastructure and Brackish Water Fields.

The project included:
Design Engineering & preparation of Contract Documents for Approval.
Bulk Earthworks & Site preparation
Six Number Raised for Climate Resilience, Containerized Brackish 500KUS gpd RO system and Accessory Equipment, & Water Blending System
One Number CIP Containerized Control Unit.
Pipe Work Distribution Infrastructure, from Feed water Location to BWRO units, to Disposal Well and Storage Tank, designed for Climate Resilient Measures.
New Glass Fused 100,000 USg storage Tank.
Six Number Booster pumps
Six Number Transformers and 3 Phase Power Distribution.
Earthing
Brine Well & Associated Pipework
3 number Standby Generators

Services Provided

Design, Build , Install and Commission
Maintenance of Service to Customers.
Fully Automated Plant
24 hour, 7 day week operation

Customer Benefits

Designed for Climate Resilience
Potable Drinkable Water Quality
Enhanced Customer & Client Experience