Utility Infrastructure

Atlantis Chilled Water Line for Dolphin Cay

Client: Island Hotel Company Ltd

Project Description

BHM were appointed by Atlantis Paradise Island, (Island Hotel Company Ltd). for the Installation of a new Chilled Water line from the existing Pump/Chiller Room to improve water coolness for the  Dolphin Cay Experience . The project including.

  • Working within a live environment, existing infrastructure & Utilities and in close proximity to Hotel Guests.
  • Connection to existing Pump and Cooling Room infrastructure, including specialized Fittings and pipe route supports.
  • Installation of 880ft of 12” PVC heavily Insulated pipe.
  • Traffic management and crossing live hotel access road, paving and white lining. 
  • Builders work in connection with existing structures.

 

Services Provided

Risk management
• Value engineering
• Construction management
• Coordination with Client

 

Customer Benefits

• Liaison withClient to ensure seamless installation and commissioning 
• Sequencing in accordance with Client/Hotel Requirements
• Single point of contact for client team
• Engineering Quality Assurance of installations
• ISO Certification